This is an Update on the Station Restoration Project.
Safety Fence on the Main Platform.
The above Photos were taken on the 26th of August, 2020.
Station from the Rail side, looking totally different since work started.
Station from the Road side. Building on the right is to be repaired with a special process.
The above Photos were taken on the 26th of August, 2020.
More Info and Photos to follow.
I have now done two trips to Photograph this Railway Station.
Have been given info from the site manager about what is happening.
So the project is Steaming ahead.
The end result for this complex is,
It will be a Visitor Hub,
Consisting of,
A Museum,
a Cafe,
An Art Gallery,
An Artist's Workshop and
A free Campsite.
There is a possibility, that by now the Roof is on the New Toilet Block.
The Verandah/Awning may also be started.
Paint on the Walls is to be removed.
The Underground Water tank has been put in.
The Septic system for the new Toilet block is done.
Fences are up for,
Parking, Railway line has been recycled for this.
Safety, For workers and visitors, stop accidents.
and
Security, to help protect the Property.
New Floor Joist's have been put in for the New Flooring.
Visitors to the site are coming two cars a day according to the site Manager.
Safety fence on the Loading Platform.
The Main Building, having new Doors and Windows made.
Toilet Block from the Rail side.Station from the Rail side, looking totally different since work started.
Station from the Road side. Building on the right is to be repaired with a special process.
Comments
Post a Comment